This comprehensive source of information on the use of marine aggregate in construction provides technical information and links to sources of detailed information to assist in specifying and use of marine aggregate. The Marine Aggregate Information Centre is managed on behalf of The Crown Estate and supported by the Marine Aggregate Industry
header image 1

CASE STUDIES - ENERGY

Newhaven ERF Energy Recycling Facility

case study newhavenThe Energy Recycling Facility (ERF) situated at North Quay, Newhaven treats household waste that is not reused, composted or recycled to generate electricity, with the capacity to handle 210,000 tonnes of waste per year.
download

 

 

 

Sizewell B Nuclear Power Station

case study sizewellSizewell B is the UK's only commercial pressurised water reactor (PWR) power station, with a single reactor. It was built and commissioned between 1987 and 1995, and first synchronised with the national grid on 14 Feb 1995. The main civil engineering contractor was John Laing plc. The power station is operated by EDF Energy. EDF's strategic target is for 20 year life extension for Sizewell B PWR, beyond the current accounting closure date of 2035.download